Skip to content

Road Department

Report a Concern

Safe Streets For All Grant Input

Submit Grant

Gravel Road

Report Concern

Paved Road

report concern

Mowing & Brush Removal

report concern

Illegal Dumping

report concern

Missing or Replacement Signs

report concern

General Comments, Questions, or Concerns

report concern

Road Department

1511 N. Ohio

Sedalia, MO 65301

Phone: (660) 826-7187

Email: roadbridge@pettiscomo.com

Road Closures

The Pettis County Road and Bridge Department would like to inform you that the McCurdy Road bridge between Smelser Road and McClure Road, will be subject to road closures for bridge replacement from September 28, 2026, until November 1, 2026. We ask that you make travel arrangements accordingly.

The Pettis County Road and Bridge Department would like to inform you of upcoming road closures on Menefee Road related to road surface maintenance. Please make alternate travel arrangements and plan accordingly during this time.

Full Closure:

Menefee Road from Highway MM to Snow Road, will be closed for PHASE 2 road surface maintenance beginning at 7:00 A.M. on Monday, August 24, 2026, weather permitting. Work is anticipated to be completed by 7:00 A.M. on Friday, August 28, 2026, weather permitting.

Daily Closures:
Menefee Road from Highway T to Snow Road is subject to daily road closures for road surface maintenance. These daily closures will remain in effect as necessary until the project is completed.

The Pettis County Road and Bridge Department would like to inform you that the Bennett Road Bridge, located between Upton Rd. and Bennett Ln., will be closed to through traffic beginning August 24, 2026, for bridge replacement. Completion of the project is anticipated in December 2026. We ask that you make arrangements during this time.

The Pettis County Road and Bridge Department would like to inform you that the McVey Rd. Bridge, located between Marshall Rd. and Goodwill Chapel Rd., is closed to through traffic effective immediately for bridge replacement. Completion of the project is anticipated in November 2026. We ask that you make arrangements during this time.

Safety is our #1 priority. We value our employees and you. Please watch for work zone signs and barricades. Please do not drive around the barricades. Signs and barricades are there to provide safety of all the workers and to prevent damage to the construction site and/or your vehicle. We appreciate your patience as we work to improve your road.

Please contact the Pettis County Road and Bridge Department at (660) 826-7187 if you have any questions.

The Pettis County Road Department is accepting applications for a Full-Time position

Applications are available below, or under the job opportunities tab, or may be picked up at the Pettis County Road and Bridge Department at 1511 N Ohio, Sedalia, MO 65301.

Completed applications can be dropped off at the Road and Bridge Department or can be emailed to roadbridge@pettiscomo.com. For questions specific to the position applied for, please call (660) 826-7187.

A qualified individual is one who:

1. Has the physical ability required to lift and to move objects weighing up to 50 pounds.

2. Can perform required duties in inclement weather conditions including ice, snow, and extreme cold or heat.

3. Has the interpersonal skills necessary to relate to colleagues and members of the public under conditions that may, on occasion, be adversarial or stressful.

4. Has vision and hearing, with or without corrective devices, considered within the normal range necessary to safely operate heavy equipment.

5. Has a valid Missouri operator’s or CDL license necessary to carry out the primary responsibilities for the position hired.

6. Must pass a pre-employment drug screen and background check.

7. Can understand, interpret, and implement verbal and written instructions.

8. Must be able to perform daily routine physical activities without restrictions.

Pettis County offers a full comprehensive benefits package that includes:

• Paid vacation

• Paid Sick

• Retirement package

• Dental

• Health

• Vision

• Life Insurance

• Paid holidays

• CDL Reimbursement Program

Application

Snow Routes

During this busy snow removal season, we will be following this listing for priority snow routes to be cleared first, if you must travel PLEASE use these designated roads

Snow Routes

Snow Route Plow Status

view MAP

Forms

2023 Policies & Procedures

Download Form

Driveway Permit

download form

Resident Excavation Permit

download form

Utility Excavation Permit

download form

download instructions form

Cooperative Right of Way

download form

Adopt a Roadway Brochure

download form

Adopt a Roadway Application

download form

New Road Requirements

download form

SS4A Action Plan

Download Form